Co-Lab Better Together

General Drawings

LinkDrawingName
OpenD1.1Wastewater As-Built Plan
OpenD1.2Stormwater As-Built Plan
OpenD1.3Water Supply As-Built Plan
OpenD1.4.1Wetland As-Built Plan
OpenD1.4.2Wetland As-Built Long Section Plan
OpenRITS SymbolsRITS Symbols

IMPORTANT - RITS Announcement

The draft RITS v2 was sent out for comment to participating councils’ key staff contacts in late January. The response by the required date was minimal, and an extension of time resulted in only one further submission.  We appreciate it is a complex and lengthy document to review. We have just received a key submission that will improve the output of this document and are now reviewing it. We will be in touch as soon as possible with the final draft. We thank you for your patience.